Quickbidz Quickbidz
DFW, TX
  • DFW, TX
  • CLT, NC
  • Home
  • Categories
    Electronics & Appliances
    Home & Furniture
    Fashion
    Health, Beauty & Fitness
    Tools & Outdoor
    Sports, Toys & Games
    Baby & Kids
    Pets
    Miscellaneous
    Pallets
  • Pallets
  • How it Works
  • Past Auctions
  • My Bids
  • Wish List
My Account
  • Sign Up
  • Sign In
0
Your shopping cart is empty.
  1. Home
  2. Home & Furniture
  3. LazBlinds No Tools No Drill Cordless 1" Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2" W x 64" H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
LazBlinds No Tools No Drill Cordless 1 Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2 W x 64 H, White
DFW, TX - 24Hour Auction
DFW, TX - 24Hour Auction
ID: 210516 Live Auction Location: DFW, TX
Previous Lot
Next Lot
ID: B0D2QFW82P Closed

LazBlinds No Tools No Drill Cordless 1" Vinyl Mini Blinds, 100% Privacy S-Curve Blinds for Indoor Windows, Room Darkening Horizontal Window Blinds and Shades for Home, 34 1/2" W x 64" H, White

Retail Value: $46.71

 

$5.00

Closed

Condition: Open Box

Description
Inside Mount ONLY. For better internal installation, a standard 3/8 inch deduction is made to the blind width. The actual blind size is 34 1/8" W x 64" H, the unique spring rod can extend 1 inch in total, allowing the blind to fit for window width 34.2-35.1 inch, blind height can adjust from 0" to 64". (Pls Note) Minimum 1 1/5" depth of window frame required for inside mount.

No Drill Blinds: No Tools-No Drill Design allows it No need to drill any holes on your window frame, Easy to Install in 30 seconds. Perfect for Renter, Landlord, and Home Buyer.

Privacy Blinds for Windows: Premium dense S-curve slats with invisible hole design can completely keep out the sunlight and UV rays, offering a real dark environment. At the same time, it is possible to use the twisting wand to switch between light filtering or room darkening. Perfect for living room, family room, bedroom, bathroom.

Cordless Blinds for Windows: Easy to raise up or lower down. No tangled or exposed cords! Suitable for families with children and pets, ensuring the safety of your family.

Fit All Kinds of Walls, like woodiness metope, tile marble, concrete wall, and rough tile. The Metal Top Rail can afford a maximum of 30kg, absolutely safe to use. We can also make custom sizes.
Place Bid
Minimum Bid: $7.00 1 bid
Location: DFW, TX
Shipping
Please wait...
5.00
Bids History
Bidder Amount Date
G****o $5.00 01/17/2026 17:45:26

Our Company

  • Contact Us
  • About Us
  • Blog

Support

  • Privacy Policy
  • Terms & Conditions
  • Schedule Pick-up

Subscribe to our Flash Auctions

Contact Info

  • DFW, TX 4500 Cambridge Road
    Suite 100
    Fort Worth, TX 76155
    United States
    325-77Q-BIDZ
    (325-777-2439)

©2026 Quicklotz • Overstock Market, LLC. NCFL #10383

American Express Master Card VISA
  • Home
  • Categories
    • Electronics & Appliances
    • Home & Furniture
    • Fashion
    • Health, Beauty & Fitness
    • Tools & Outdoor
    • Sports, Toys & Games
    • Baby & Kids
    • Pets
    • Miscellaneous
    • Pallets
  • All Auctions
  • How it Works
  • Past Auctions
  • My Bids
  • Go Pro
  • Sign Up or Sign In
Our website uses cookies. By continuing, you consent to the use of cookies on your device, unless you have disabled them from your browser.