Quickbidz Quickbidz
DFW, TX
  • DFW, TX
  • CLT, NC
  • Home
  • Categories
    Electronics & Appliances
    Home & Furniture
    Fashion
    Health, Beauty & Fitness
    Tools & Outdoor
    Sports, Toys & Games
    Baby & Kids
    Pets
    Miscellaneous
    Pallets
  • Pallets
  • How it Works
  • Past Auctions
  • My Bids
  • Wish List
My Account
  • Sign Up
  • Sign In
0
Your shopping cart is empty.
  1. Home
  2. Home & Furniture
  3. Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
DFW Sunday Auction | General Merchandise
DFW Sunday Auction | General Merchandise
ID: 250356 Live Auction Location: DFW, TX
Previous Lot
Next Lot
ID: B09MWJ3Z16 Closed

Hsscblet 5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black

Retail Value: $35.99

 

$15.00

Closed

Condition: Open Box

Description
MAYEB MISSING PIECES

Sturdy and Durable Metal: The 5 tiers shoe rack is made of sturdy and smooth powder coated metal tubing with corrosion resistant and high quality plastic connectors. Stable, each shelf can hold up to 11 pounds and has a long service life.

More large space: This expandable shoe rack holds up to 20 pairs of shoes. You can remove one layer to put boots or other large items. Besides shoes, this modern shoe rack can hold hats, books, bags, small accessories, and sundries to maximize your space!

Multifunctional: The black shoe rack cabinet has hanging hooks that allow you to hang commonly used items on the side hooks such as umbrellas, belts, keys, bags, hats, shopping bags, rackets, etc.

Product Dimension: The size of 35.6"x12.2"x35.03", can be placed in the kitchen for utensils and tableware. In the entrance, it can help keep clean and tidy. The shelf in the bedroom can hold miscellaneous things in the closet to keep clothes neat and tidy, making the room look cleaner.

EASY TO ASSEMBLE: No tools needed, free standing shoe rack includes instruction manual. You can have it assembled in about 5 minutes.
Place Bid
Minimum Bid: $17.00 6 bids
Location: DFW, TX
Shipping
Please wait...
15.00
Bids History
Bidder Amount Date
D****i $15.00 05/24/2026 20:59:47
N****3 $13.00 05/24/2026 20:28:10
N****g $11.00 05/24/2026 19:59:44
I****d $9.00 05/24/2026 05:56:03
D****i $7.00 05/23/2026 20:57:40
T****a $5.00 05/22/2026 23:40:16

Our Company

  • Contact Us
  • About Us
  • Blog

Support

  • Privacy Policy
  • Terms & Conditions
  • Schedule Pick-up

Subscribe to our Flash Auctions

Contact Info

  • DFW, TX 13755 Diplomat Dr, Farmers Branch, TX 75234
    325-77Q-BIDZ
    (325-777-2439)

©2026 Quicklotz • Overstock Market, LLC. NCFL #10383

American Express Master Card VISA
  • Home
  • Categories
    • Electronics & Appliances
    • Home & Furniture
    • Fashion
    • Health, Beauty & Fitness
    • Tools & Outdoor
    • Sports, Toys & Games
    • Baby & Kids
    • Pets
    • Miscellaneous
    • Pallets
  • All Auctions
  • How it Works
  • Past Auctions
  • My Bids
  • Go Pro
  • Sign Up or Sign In
Our website uses cookies. By continuing, you consent to the use of cookies on your device, unless you have disabled them from your browser.